The tram used in Haizhu District is a new type rail transportation tool. Ultra-capacitor is used as power supply unit. More than 85% of braking power could be transferred to electric energy to be re-used. Thus the overhead catenary is unnecessary. The power will be charged during each stop. This is a green, intelligent and environmental rail transportation tool which has no visual pollution, no charging damage and no corrosion for underground pipes. The vehicle adopts 4 modular formation including 3 motor cars and 1 trailer car. The maximum operation speed is 70km/h and the design life is 30 years.
|
|
Current collection mode:
|
Charge in Station
|
Train configuration:
|
=Mc1+M++T+Mc2=
|
Length: |
36548mm
|
Width: |
2650mm |
Floor height: |
350mm
|
Wheelbase: |
1800mm
|
Axle load: |
10t
|
Passenger capacity: |
368 people
|
|
|
|
|