Vehicles for Guangzhou Metro Line 3

Source: DateTime:2017-07-29

        CRRC ZELC and SIEMENS cooperated and got the order which need provide 120 metros for Guangzhou rail transportation line 3 (3 cars for each train, 40 trains in total ) in 2003. Guangzhou rail transportation line 3 is 36.33km. It has 18 stations in total.

 

Current collection mode: DC 1500V overhead catenary
Train configuration: -A+B+A-
Length: 59940mm
Width: 2800mm
Floor height: 1130mm
wheelbase: 2300mm
Axle load: 14t
Passenger capacity: 941 people